Cwicr Work Breakdown

Break down CWICR work items into component resources. Decompose aggregate items, analyze resource composition, and generate detailed bills of resources.

Why use this skill?

Decompose construction work items into detailed labor, material, and equipment bills with the CWICR Work Breakdown agent skill for precise project costing.

skill-install — Terminal

Install via CLI (Recommended)

clawhub install openclaw/skills/skills/datadrivenconstruction/cwicr-work-breakdown
Or

What This Skill Does

The Cwicr Work Breakdown skill is a specialized data engineering tool designed for construction project management and estimation. It enables users to take aggregated work items—common in CWICR (Construction Work Item Costing and Resource) databases—and decompose them into their specific constituent resources. By calculating the precise requirements for labor categories, raw material quantities, and equipment hours, the skill transforms high-level work items into detailed, actionable Bills of Resources (BOR).

Installation

To integrate this skill into your OpenClaw environment, use the following CLI command: clawhub install openclaw/skills/skills/datadrivenconstruction/cwicr-work-breakdown Ensure your local environment has the required Python dependencies, specifically pandas and numpy, as the skill utilizes high-performance indexing for rapid resource lookup.

Use Cases

This skill is essential for project planners and procurement managers. Common use cases include: 1) Cost Estimation Accuracy, where you need to calculate the precise unit cost of a complex item like a reinforced concrete column. 2) Procurement Planning, which involves generating shopping lists for materials based on a project schedule. 3) Labor Scheduling, where the agent identifies exactly which skilled labor categories are required to complete a specific phase of construction. 4) Budget Variance Analysis, by comparing the estimated component costs against actual expenditure logs.

Example Prompts

  1. "Decompose the 'Concrete Footing C-101' work item and generate a bill of resources including all necessary equipment and labor hours."
  2. "Given the current project schedule, provide a summarized bill of materials for all pending work items in the 'Foundation' category."
  3. "Analyze the labor cost distribution for the 'Structural Steel' installation work item and list the top three highest-cost resource components."

Tips & Limitations

For best results, ensure your input dataframes are clean and contain strictly defined work_item_code and resource_code columns. The skill's performance scales linearly with the number of work items, but memory consumption will increase when processing massive datasets with thousands of sub-components. Always verify that your unit rates are current, as the skill performs static calculation based on the provided dataframe values and does not fetch real-time market prices unless connected to an external pricing API.

Metadata

Stars1100
Views3
Updated2026-02-17
View Author Profile
AI Skill Finder

Not sure this is the right skill?

Describe what you want to build — we'll match you to the best skill from 16,000+ options.

Find the right skill
Add to Configuration

Paste this into your clawhub.json to enable this plugin.

{
  "plugins": {
    "official-datadrivenconstruction-cwicr-work-breakdown": {
      "enabled": true,
      "auto_update": true
    }
  }
}

Tags(AI)

#construction#estimation#project-management#data-analysis#engineering
Safety Score: 5/5

Flags: file-read, code-execution